AGRU investit dans la fabrication...
Au long de la courte route nationale B 122, peu avant Bad Hall en Autriche, quelque chose s'agite depuis plusieurs mois. Des travaux de terrassement...
En savoir plusAGRU Kunststofftechnik GmbH supports the HTL Steyr with special gauge equipment. These devices were required for the implementation of a diploma project which includes the optical measurement of welds.
En savoir plusVia its sales partner AURO, AGRU has supplied all the piping components for a Hungarian industrial company's process water plant in PVDF.
En savoir plusSAVE THE DATE!
Symposium with AGRU Plant Inspection "Plastics for environmental technology - exhaust air and flue gas purification in focus" on 04.04.2017 at 13:00 - 18:00 in our AGRU Headquarter in Bad Hall.
En savoir plusRecord-breaking HDD-installation of PE pipes with OD 1400 mm in order to construct a large-diameter, twin-pipe culvert underneath the Spree river in Germany.
En savoir plusThe design, planning and delivery of a gas scrubber column was a sophisticated teamwork accomplished by HESON and AGRU.
En savoir plusHighest precision, enormous patience and millimeter accurate processing are the requirements for the production of this fitting.
En savoir plusAGRU invents high temperature geomembranes for solar technologies and participates in "SolPol".
En savoir plusOutstanding stress cracking resistance of Sureline® II and SurePex® pipes
En savoir plusThe durable PE piping system for high volume flows.
En savoir plusAGRU is represented at K 2016 from Oktober 19-26, 2016 in Germany with a 66 square meter trade fair stand.
En savoir plus